PEB Buildings


The Pre-engineered building is one of the fast growing building system around the world. 

There are many applications for pre-engineered buildings. It can be automobile garage to aircraft hangar, bakery to dairy farm, auditorium to hospital, and factory to community hall.


Reduction of project cost

Cost saving primarily results from time   saving on the Project. This also results in earlier realization of revenue to   owner on a commercial project

Saving in construction time

About 30-50% time saving in total project   schedule due to fast delivery and quick site fabrication

Low Maintenance

High quality paint systems are available   for steel and cladding to be provided along with maintenance free service   life

Large clear spans

Buildings can be supplied in clear spans   up to 90 meter, particularly suitable for aircraft hangers, sports hall, etc.

Flexibility in expansion

Buildings can be designed for future   expansion in length, width and height.

Energy efficiency

Buildings are supplied with roof and wall   insulation to reduce energy costs and improve working environment inside the   building

Superior quality

Complete manufacturing is done in factory   as per ISO, CE, TUV, BV, SGS and other relevant quality assurance standards


PEB Buildings

Conventional Building

Higher resistance to seismic forces due   to light weight flexible frames

Rigid heavy weight structures not   suitable for seismic zones

Reduced time because of international   design standards & codes using standard sections and connections

Increased design time due to scratch and   availability of less design aids

30% less PEB steel structures weight   through efficient use of steel

High weight due to excessive safety   factor and the usage of heavier steel sections

Factory controlled quality

Every project to be fabricated at site

Lower initial cost of peb steel   buildings(cost per square meter about 30% less than the conventional) and   faster delivery

Special design and features developed for   each project at higher costs

Simple Foundation, easy to construct and   light weight of PEB structures

Extensive heavy foundation

Average delivery time 4-8 weeks

Average delivery time 22-28 weeks