Publish Time: 2022-06-15 Origin: Site
Prefab Steel Structure Building For Warehouse
Structure System: Light Steel Structure
Construction Site: Thailand
Project Details:
1. Primary Steel Structure: Welded H section steel with primer and facing white painting, which will be bolted together at site
2. Secondary Frame: Galvanization C Purlin, Tie Bar, Roof and Wall Support are formed as secondary framing
3. Bracing: Round steel is supplied with knee bracing and other supporting parts that need portal framing, which will improve the stability and durability of the whole structural building.
4. Roof and Wall Cladding: Alu-zinc color-coated steel sheet
Agriculture Steel Buildings Industrial Steel Structure Steel Building Steel Structure Warehouse Steel Structure