|
Product Description
Primary members (columns, beams) : Steel columns and beams will be build-up H section steel, square tube steel according to different type of buildings.
Secondary members (C or Z purlins, bracing...)
Roof and wall sheeting or sandwich panel (EPS, fiberglass wool, PU sandwich panel)
Other building components (Rolling doors, aluminium windows, etc. The entire primary members and secondary members are designed and fully fabricated including cut-to-length, punching, drilling, welding and performing in the factory before shipping to the site for erection.
At the site, all components are assembled and jointed by nut & bolt connections; thereby reducing the costs and assembly times.
These buildings can be provided with different structural and non-structural additions such as ventilators, doors & windows, trusses, mezzanine floors, canopies, crane, insulation…, based on the customer's requirements.
|
Product Packaging
|
Application Video
|
Comment & FAQ
1. What Procedures Are Required When Building A Steel Structure Workshop?
First, confirm the land is industrial land purpose, if it is not legal industrial land, it will be allowed to build steel structure workshop on it.
Second, if building a steel structure workshop on leased land, it needs to specify who will owns the building after term of lease. Or you can choose to renew this workshop building lease.
Third, take the workshop procedures to local Land Administration Bureau to handle the relevant formalities, you need to get certificate for the right of land usage first, and then a planning permission.
Fourth, go to local environmental protection department and construction department to apply for documents and certificates. A construction permit is required before starting steel structure workshop construction.
2. Why Does Modern Industrial Workshop Choose Steel Structure Building Soultion?
Fast construction speed: Steel structure workshop can be fabricated quickly because steel components can be prefabricated in the factory and only need to be bolted on construction site, which shortens the construction period.
Eco-friendly and sustainable: Steel can be recycled and reused, and the noise and dust generated during the construction process are relatively small.
High strength and light weight: Steel structure workshop has high strength and can withstand large loads. At the same time, their weight is relatively light, which can reduce the cost and construction difficulty of civil engineering works.
High space utilization rate: The space utilization rate of steel structure workshop is high, because the steel structure can arrange the space flexibly, making the space of the workshop more flexible and open.
Easy maintenance: Steel structure workshop has good anti-corrosion and fire-proof properties, which can reduce maintenance costs and difficulty.
In summary, modern industrial workshop design and warehouse construction prefer steel structure building solution because of its fast construction, environmental sustainability, high strength, light weight, high space utilization and easy maintenance. If you need the steel structure workshop building, warmly welcome your inquiry to anna@sinosteelstructure.com, or Whatsapp us +86-15853209069
|
Company Profile
There are 600 employees working at Qingdao Xinguangzheng Steel Structure Co., Ltd now, including National registered engineers (5 people), Senior engineer (20 people), engineers (70 people), Registered architect (9 people), other technicians (> 120 people), to provide best and most economical solutions in a timely and professional manner for our customers.
Qingdao Xinguangzheng Steel Structure possessed large precise and advanced equipments and production lines such as Assembly Machine, Single-armed Type SAW Machine, Shot Blasting Machine, Flaming Cutting Machine, CNC Intersecting line Cutting Machine, Purlin Machine, Corrugated Steel Sheet Production Line, Sandwich Panel Production Line, etc.
Built on over 28 years of steel structure experience, our products had been exported to more than 110 countries & regions around the world, both of our company and products are well received and got high reputation at home and abroad.
|
Production Process
|
Certifications
|
Data Sheet
Package | Steel Pallet packed steel structure | Delivery Time | 30-45days |
Supply Ability | 20,000ton/year | Payment Terms | T/T,L/C |
Main Structure | Portal Frame | Secondary Structure | Galvanized Purlins |
Cladding | Steel sheeting, steel sandwich panel | Windows | Aluminum alloy window |
Doors | Roller door, Sectional door, Steel door | Certification | ISO/CE/SGS/TUV/BV |
Mezzanine, Office, Glass Curtain Wall, Aluminum Composite Panel Decoration | |||
Place of Origin | Qingdao, China | Brand Name | XGZ |
|
Optional Surface
|
Testing Quality
Contact: Ms. Anna Lu
Office Tel: +86-532-8830 6188
Mobile/Wechat/Whatsapp :
+86-158 5320 9069
E-mail: trodasteel@qdxgz.cn
Skype: qd_anna
Address: No. 268, Sancheng Road, Pingdu, Qingdao, Shandong, China
Agriculture Steel Buildings Industrial Steel Structure Steel Building Steel Structure Warehouse Steel Structure