PEB Building

Views:0     Author:Site Editor     Publish Time: 2021-06-21      Origin:Site

The Pre-engineered building is one of the fast growing building system around the world. It has all the attributes of what the modern life-style demands, e.g, speed, quality and value. There are many applications for pre-engineered buildings. it can be automobile shop to aircraft hangar, bakery to dairy farm, auditorium to hospital, and factory to community hall.

Reduction of project cost

Cost saving primarily results from time saving on the project. This also results in earlier realization of revenue to owner on a commercial project

Saving in construction time

About 30-50% time saving in total project schedule due to fast delivery and quick site fabrication

Low Maintenance

High quality paint systems are available for steel and cladding to be provided along with maintenance free service life

Large clear spans

Buildings can be supplied in clear spans up to 90 meter, particularly suitable for aircraft hangers, sports hall, etc.

Flexibility in expansion

Buildings can be designed for future expansion in length, width and height.

Energy efficiency

Buildings are supplied with roof and wall insulation to reduce energy costs and improve working environment inside of building

Superior quality

Complete manufacturing is done in factory as per ISO, CE, TUV, BV, SGS and other relevant quality assurance standards

 

PEB Buildings

Conventional Building

Higher resistance to seismic forces due to light weight flexible frames

Rigid heavy weight structures not suitable for seismic zones

Reduced time because of international design standards & codes using standard sections and connections

Increased design time due to scratch and   availability of less design aids

30% less PEB steel structures weight through efficient use of steel

High weight due to excessive safety   factor and the usage of heavier steel sections

Factory controlled quality

Every project to be fabricated at site

Lower initial cost of peb steel buildings(cost per square meter about 30% less than the conventional) and faster delivery

Special design and features developed for each project at higher costs

Simple Foundation, easy to construct and light weight of PEB structures

Extensive heavy foundation

Average delivery time 4-8 weeks

Average delivery time 22-28 weeks

 


No. 268, Sancheng Road, Pingdu, Qingdao, Shandong, China
Mobile/Wechat/Whatsapp : 
+86-158-5320-9069 / +86-178-0625-1013
About Us
 “Passion, Practicality, Gratitude, and Transcendence” is our corporate spirit.

Public

Personal

Company links
Product Categories
Our Project
Copyrights © 2021 Qingdao Xinguangzheng Steel Structure Co., Ltd. All Rights Reserved  Technology by leadong